NBMC Shelby, Montana
Shelby Montana
News

Welcome to NBMC, Shelby, Montana! Look below for news and events. Use our FREE classified ads below. Contact NBMC here about operating your own location anywhere in the world. You only need access to a computer, the Internet and a basic digital camera. We do the rest. Enjoy the many benefits of being a member of the press today! NBMC also needs someone to work in the Shelby area starting immediately.



Use our free classified ads today...

The all new Ringside Ribs is more than ribs. They have a complete menu; a well stocked bar and a casino. They are open seven days a week, 11 AM to 10 PM and located just behind Town Pump. Call them at 424-7427.

Don and the rest of the crew are unpacked from the old store and ready to help you with all your auto and shop needs. The big new and bright building is located at 100 Main St. just across from the Shelby Visitor Center. Phone them at 434-5551.

Listen to Sounds Eclectic while at NBMC.
Double Click Play Button, Then The News Is Below. Note: May Not Work With Dial Up Connection.
Double Click Play Button, Then The News Is Below. Note: May Not Work With Dial Up Connection.
NBMC Shelby, Montana: December 2006

Sunday, December 24, 2006

Pizza Hut Focus Of Firefighters

Shortly after 6:00 PM Shelby Firefighters responded to a call to Pizza Hut. There was a report of something burning in the ventilating system. Three fire trucks arrived and firefighters quickly climbed a ladder to the roof. They spent the next twenty minutes searching for a fire in the vent area. Patrons of the restaurant continued to dine while the search continued. It was then decided that there was no fire danger and the firefighters returned to the fire hall.

NBMC Shelby
For the latest news and events get our free XML feed. Sign up below.
Our Free XML Feed

Post your comments at the link below.
email to a friend, click white envelope >>>

Thursday, December 21, 2006

Advertising On-line Extremely Efficient

New Research Proves Effectiveness of On-line Local, Directory and Classifieds Advertising

Key Highlights:
-Return on Investment (ROI) analysis shows that on-line local, directory and classifieds are extremely efficient vehicles.
-A significant portion of conversions occur offline and those must be incorporated in the ROI calculation to recognize the full benefit.
-On-line local, directory and classified listings offer significant branding benefits.

Advertising at NBMC is even more effective since we do not use annoying banners or pop-ups. Contact us to see how you can reach local readers for much less than other media.
email to a friend, click white envelope >>>

Wednesday, December 13, 2006

More Improvements For You

For well over four years NBMC has undergone many changes. These changes have had one mission, to improve for you, our readers and viewers. Our latest improvements are the Blog sections you are reading now, plus, its new layout. The Blog gives you the chance to influence our stories, look and feel by your comments. The new layout makes us look great on a 1.5 inch by 1.5 inch screen such as your new Web enabled cell phone or your new 6 foot widescreen digital HD television. If you have a high bandwidth connection, such as a digital cable modem or broadband cellular, you will now start receiving live Internet based news & entertainment shows from NBMC. Slower connections, such as dial-up, will still bring you all that is NBMC right here.
Thank you for making us better,
Gus Robertson
Owner, NBMC News & Events
Happy Holidays!

Comment at the link below.
email to a friend, click white envelope >>>

Monday, December 04, 2006

Rough Weather Slows Prison Expansion

The same huge snow and ice storm that hit much of the North-western USA has slowed Corrections Corporation of America's project for enlarging the prison at Shelby. After a flurry of work on the estimated 96 bed building divided by two "pods" Winter weather and other issues have all but halted work at the building site. Pods are the separated sections used to segregate certain populations of inmates. Pods in groups of two or three are under the control of a Pod Control Officer. The newest section of pods to the Shelby prison will be for federal inmates only. The building is largely prefabricated off-site as large concrete sections and are moved by heavy hauling Semi-trucks to the building site. Bad weather makes it to dangerous to move and install them. Besides this, the new fresh concrete that the building sits on needs time to cure/harden. NBMC has also learned that this new section will be largely inmate cell units built of steel rather than the full concrete of the original areas.

In the below photo, a lonely guard post sits empty as work is halted. Even though the new building area is heavily divided by fence and razor wire, each truck and contractor, plus, their employees must be checked before entering the construction zone. There is an entry way from the existing prison layed out that will access the new building when the construction is complete, but will be finished only when ready to safely relocate the prisoners.
NBMC Shelby Photo

Click photo for larger view.

Post your comments at the link below.
email to a friend, click white envelope >>>